I-30 East Corridor — Proposed Right of Way
93 proposed right-of-way boundary lines for the I-30 East Corridor reconstruction. Shows how far the new highway footprint extends beyond current ROW. Source: Halff Associates / TxDOT.
Showing 93 of 186 features. The download has all of them.
Fields
| Name | Filled | Example |
|---|---|---|
| Fill | 100% | -1 |
| Class | 100% | Primary |
| Color | 100% | 2 |
| Layer | 100% | C-RWAY-LINE |
| LyrOn | 100% | 1 |
| QrotW | 100% | 0 |
| QrotX | 100% | 0 |
| QrotY | 100% | 0 |
| QrotZ | 100% | 0 |
| DocVer | 100% | V8 |
| GGroup | 100% | 0 |
| Handle | 100% | 461D |
| Level_ | 100% | 4445 |
| LineWt | 100% | 2 |
| DocName | 100% | ENV_TEC_ROWPR_Dec2022.dgn |
| DocPath | 100% | I:\31000s\31426\GIS\Data\Project_Design\I30EC_45toFerg\worki |
| DocType | 100% | DGN |
| LTScale | 100% | 0 |
| LvlDesc | 100% | C-RWAY-LINE |
| LvlPlot | 100% | 1 |
| LyrFrzn | 100% | 0 |
| LyrLock | 100% | 0 |
| RefName | 100% | |
| CadModel | 100% | Default |
| EntColor | 100% | -1 |
| Linetype | 100% | Solid |
| LyrColor | 100% | 2 |
| OBJECTID | 100% | 1 |
| Elevation | 100% | 0 |
| EntLineWt | 100% | -1 |
| LyrLineWt | 100% | 2 |
| LyrLnType | 100% | Dash Double-dot |
| EntLinetyp | 100% | Dash Double-dot |
| Transportation_Project_SDE.GISDBO.I30EC_Proposed_ROW.Entity | 100% | Arc |