Dallas Bike Plan 2025 — Phase 1 Priority Routes

13 highest-priority unfunded bike routes (14.8 miles) identified in the Dallas Bike Plan 2025 for construction in the next 5 years. Includes physically separated bike lanes, visually separated lanes, neighborhood bikeways, and trails. These are the Top Priority Projects from Technical Report 3. Source: City of Dallas Bike Plan 2025.

  • cycling
  • transportation
  • priority
  • phase-1
  • bike-plan
  • real_estate
  • infrastructure
  • environment

Fields

NameFilledExample
name100%Ewing Ave (Clarendon Dr to Saner Ave) - Visually Separated
Location100%Ewing Ave
Unique_ID100%13
Length_Mil100%1.992289219992626
LocationFr100%Clarendon Dr
LocationTo100%Saner Ave
Name_Conca100%Ewing Ave (Clarendon Dr to Saner Ave) - Visually Separated
Proj_Phase100%1
ProposedFa100%Visually Separated
StatusSimp100%Planned
BikePlanClassification100%Visually Separated