Dallas Bike Plan 2025 — Phase 1 Priority Routes
13 highest-priority unfunded bike routes (14.8 miles) identified in the Dallas Bike Plan 2025 for construction in the next 5 years. Includes physically separated bike lanes, visually separated lanes, neighborhood bikeways, and trails. These are the Top Priority Projects from Technical Report 3. Source: City of Dallas Bike Plan 2025.
Fields
| Name | Filled | Example |
|---|---|---|
| name | 100% | Ewing Ave (Clarendon Dr to Saner Ave) - Visually Separated |
| Location | 100% | Ewing Ave |
| Unique_ID | 100% | 13 |
| Length_Mil | 100% | 1.992289219992626 |
| LocationFr | 100% | Clarendon Dr |
| LocationTo | 100% | Saner Ave |
| Name_Conca | 100% | Ewing Ave (Clarendon Dr to Saner Ave) - Visually Separated |
| Proj_Phase | 100% | 1 |
| ProposedFa | 100% | Visually Separated |
| StatusSimp | 100% | Planned |
| BikePlanClassification | 100% | Visually Separated |