Austin Project Connect Light Rail — Phase 1

9.8-mile light rail with 15 stations. Blue Line (38th St to Yellow Jacket via East Riverside) and Orange Line (38th St to Oltorf via South Congress). Federal environmental clearance received January 2026. Opening 2033.

  • project-connect
  • transportation
  • government
  • transit
  • capmetro
  • light-rail
  • environment
  • austin

Showing 17 of 34 features. The download has all of them.

Fields

NameFilledExample
line100%Orange
name100%Orange Line (38th St → Oltorf)
type100%route
status100%In Development
notes88%Northern terminus
title88%38th Street
length_mi12%6.2