[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fPgGFCT3Hnp_7st0bn0SXvjmmACHguLVL5VQar1OM7SA":3},{"dataset":4,"fields":64,"features":104,"truncated":1062,"preview_count":16},{"uuid":5,"slug":6,"title":7,"description":8,"tags":9,"feature_count":16,"source_url":17,"updated":18,"base_map":19,"lat":20,"lng":21,"zoom":22,"style":23,"licence":57,"geometry_types":58,"bbox":59},"5d1b91a2-7aa8-42b3-ae53-d34c28392084","texas-data-center-construction-filings","Texas Data Center Construction Filings","338 data center construction projects registered with TDLR across 77 Texas cities, 2008–2026. Every project costing $50,000 or more must register with the state for accessibility review, usually months before a permit is pulled — so this is the earliest public record that a data center is being built. Circles are sized by total estimated cost and positioned at the CITY centroid, not the site: TABS search records carry no street address. Costs are filing estimates; implausible values (see cost_flagged) are excluded from totals. Projects filed under code names rather than 'data center' are not captured, so this is a floor.",[10,11,12,13,14,15],"data-centers","construction","texas","tdlr","tabs","development",77,null,"2026-08-02T19:54:23.979703+00:00","satellite",31.3,-99.2,6,{"circle":24},{"type":25,"paint":26,"filter":52},"circle",{"circle-color":27,"circle-radius":42,"circle-opacity":49,"circle-stroke-color":50,"circle-stroke-width":51},[28,29,31,34,35,36,37,38,39,40,41],"interpolate",[30],"linear",[32,33],"get","total_cost",0,"#93c5fd",500000000,"#3b82f6",2000000000,"#1d4ed8",10000000000,"#1e1b4b",[28,43,44,34,45,36,46,38,47,40,48],[30],[32,33],5,14,24,40,0.85,"#ffffff",1.5,[53,54,56],"==",[55],"geometry-type","Point","CC0-1.0",[56],[60,61,62,63],-106.4922918,26.196695,-94.135051,35.2060964,[65,69,72,75,78,81,83,86,89,92,95,98,101],{"name":66,"filled":16,"coverage":67,"sample":68},"city",100,"Midlothian",{"name":70,"filled":16,"coverage":67,"sample":71},"county","Ellis",{"name":73,"filled":16,"coverage":67,"sample":74},"filings","7",{"name":76,"filled":16,"coverage":67,"sample":77},"projects","Sharka Data Center - Building 5 ($492M); Sharka Data Center ",{"name":79,"filled":16,"coverage":67,"sample":80},"first_year","2018",{"name":33,"filled":16,"coverage":67,"sample":82},"1743427252",{"name":84,"filled":16,"coverage":67,"sample":85},"latest_year","2025",{"name":87,"filled":16,"coverage":67,"sample":88},"cost_flagged","0",{"name":90,"filled":16,"coverage":67,"sample":91},"largest_cost","491727252",{"name":93,"filled":16,"coverage":67,"sample":94},"geometry_source","city_centroid",{"name":96,"filled":16,"coverage":67,"sample":97},"largest_project","Sharka Data Center - Building 5",{"name":99,"filled":16,"coverage":67,"sample":100},"new_construction","5",{"name":102,"filled":16,"coverage":67,"sample":103},"total_cost_label","$1.74B",[105,117,133,148,165,181,196,209,222,236,249,261,273,288,300,315,329,342,354,368,383,398,411,425,436,451,464,476,489,502,514,527,538,552,566,576,589,600,613,625,638,649,661,674,685,697,709,722,735,747,758,770,781,791,802,814,827,838,848,861,871,882,893,903,915,927,936,948,959,971,983,994,1005,1015,1027,1039,1050],{"type":106,"geometry":107,"properties":111},"Feature",{"type":56,"coordinates":108},[109,110],-96.994499,32.482209,{"city":68,"uuid":112,"county":71,"filings":113,"projects":114,"first_year":80,"total_cost":115,"latest_year":85,"cost_flagged":34,"largest_cost":116,"geometry_source":94,"largest_project":97,"new_construction":45,"total_cost_label":103},"e42fa066-7293-4acd-8b17-5d119324de50",7,"Sharka Data Center - Building 5 ($492M); Sharka Data Center - Building 4 ($350M); MDN Sharka Data Center - Building 3 ($300M); Sharka Data Center - Phase 2 ($300M); SHARKA DATA CENTER ($300M); Sharka Data Center Building 2 Spoke ($1M)",1743427252,491727252,{"type":106,"geometry":118,"properties":122},{"type":56,"coordinates":119},[120,121],-98.8714689,29.3558178,{"city":123,"uuid":124,"county":125,"filings":126,"projects":127,"first_year":128,"total_cost":129,"latest_year":85,"cost_flagged":34,"largest_cost":130,"geometry_source":94,"largest_project":131,"new_construction":126,"total_cost_label":132},"Castroville","d5871e1e-1a29-410a-ad3a-4ea64b5610c4","Medina",3,"SAT89\u002F90 Data Center ($765M); SAT82 Data Center ($483M); Microsoft SAT82 Data Center ($400M)","2024",1647600000,765000000,"SAT89\u002F90 Data Center","$1.65B",{"type":106,"geometry":134,"properties":138},{"type":56,"coordinates":135},[136,137],-96.684108,32.59067,{"city":139,"uuid":140,"county":141,"filings":45,"projects":142,"first_year":85,"total_cost":143,"latest_year":144,"cost_flagged":34,"largest_cost":145,"geometry_source":94,"largest_project":146,"new_construction":45,"total_cost_label":147},"Wilmer","73e4d5f2-6b7d-4c77-b9e6-233c187cfee3","Dallas","QTS DFW2 DC3 ($350M); Stream Data Centers - DFWC1 ($300M); QTS DFW2 DC2 ($300M); QTS DFW2-DC5 ($290M); QTS DFW2-DC6 ($290M)",1530000000,"2026",350000000,"QTS DFW2 DC3","$1.53B",{"type":106,"geometry":149,"properties":153},{"type":56,"coordinates":150},[151,152],-98.596956,29.377294,{"city":154,"uuid":155,"county":156,"filings":157,"projects":158,"first_year":159,"total_cost":160,"latest_year":85,"cost_flagged":34,"largest_cost":161,"geometry_source":94,"largest_project":162,"new_construction":163,"total_cost_label":164},"San Antonio","9fb018ce-8dd1-4efb-bad2-a780dd001481","Bexar",38,"EX West Green Data Center Phase 2 ($280M); VANTAGE DATA CENTER (TX12) ($277M); Vantage Data Centers TX22 ($272M); Vantage Data Centers TX21 Core and Shell +16MW Fit-Out ($157M); Vantage Data Centers TX21 Tenant Fit-out ($135M); Data Center Building TX11 ($96M)","2008",1505946003,279988945,"EX West Green Data Center Phase 2",12,"$1.51B",{"type":106,"geometry":166,"properties":170},{"type":56,"coordinates":167},[168,169],-97.428032,32.767305,{"city":171,"uuid":172,"county":173,"filings":174,"projects":175,"first_year":176,"total_cost":177,"latest_year":144,"cost_flagged":34,"largest_cost":178,"geometry_source":94,"largest_project":179,"new_construction":126,"total_cost_label":180},"Fort Worth","01d70fa5-7243-4dc3-9a89-a3824a6baf86","Tarrant",25,"QTS FTW1 DC1 Expansion ($300M); QTS FTW1 DC2 ($220M); QTS FTW1 DC1 Expansion ($130M); QTS FTW1 DC2 ($100M); QTS FTW1 DC1 Expansion ($44M); QTS FTW1 DC1 Expansion Data Hall Build Out ($42M)","2010",895209200,300000000,"QTS FTW1 DC1 Expansion","$895M",{"type":106,"geometry":182,"properties":186},{"type":56,"coordinates":183},[184,185],-96.949933,32.813879,{"city":187,"uuid":188,"county":141,"filings":189,"projects":190,"first_year":176,"total_cost":191,"latest_year":144,"cost_flagged":34,"largest_cost":192,"geometry_source":94,"largest_project":193,"new_construction":194,"total_cost_label":195},"Irving","869f5030-b68c-4b3c-8bde-3dcfbab7a39e",26,"QTS-DFW1-DC5 ($180M); QTS-DFW1-DC5 ($180M); QTS Data Center ($152M); QTS DFW1-DC4 ($65M); QTS DFW20 - COLO EFO ($56M); Edged DFW Data Center ($35M)",810670000,180000000,"QTS-DFW1-DC5",4,"$811M",{"type":106,"geometry":197,"properties":201},{"type":56,"coordinates":198},[199,200],-99.732736,33.157635,{"city":202,"uuid":203,"county":202,"filings":204,"projects":205,"first_year":85,"total_cost":206,"latest_year":85,"cost_flagged":34,"largest_cost":145,"geometry_source":94,"largest_project":207,"new_construction":204,"total_cost_label":208},"Haskell","2947336f-fa42-44b6-96de-d93908b56035",2,"Data Center THM2A ($350M); Data Center THM1A ($350M)",700000000,"Data Center THM2A","$700M",{"type":106,"geometry":210,"properties":214},{"type":56,"coordinates":211},[212,213],-96.7962148,32.7779765,{"city":141,"uuid":215,"county":141,"filings":216,"projects":217,"first_year":159,"total_cost":218,"latest_year":144,"cost_flagged":34,"largest_cost":219,"geometry_source":94,"largest_project":220,"new_construction":113,"total_cost_label":221},"28de313e-7cbe-43a5-8157-ae96f966e458",36,"QTS DFW2-DC1 ($288M); QTS DFW2-DC4 ($175M); COLOGIX DAL3 (EQUINIX DATA CENTER) ($25M); PRIME DATA CENTER ($22M); Phase 2 Data Center Finish Out ($18M); TMobile Dallas Data Hall 0500 Expansion ($14M)",626935442,288000000,"QTS DFW2-DC1","$627M",{"type":106,"geometry":223,"properties":227},{"type":56,"coordinates":224},[225,226],-96.980029,31.000923,{"city":228,"uuid":229,"county":230,"filings":231,"projects":232,"first_year":144,"total_cost":233,"latest_year":144,"cost_flagged":34,"largest_cost":233,"geometry_source":94,"largest_project":234,"new_construction":231,"total_cost_label":235},"Burlington","50381858-436e-4fb7-87e3-48bce762e631","Milam",1,"FREEBIRD DATA CENTER PHASE 1 ($470M)",470000000,"FREEBIRD DATA CENTER PHASE 1","$470M",{"type":106,"geometry":237,"properties":241},{"type":56,"coordinates":238},[239,240],-97.672443,29.884706,{"city":242,"uuid":243,"county":244,"filings":231,"projects":245,"first_year":144,"total_cost":246,"latest_year":144,"cost_flagged":34,"largest_cost":246,"geometry_source":94,"largest_project":247,"new_construction":231,"total_cost_label":248},"Lockhart","bdcffac8-7d21-425c-982b-b3d7609af5c9","Caldwell","Prime Data Center AUS-01 ($400M)",400000000,"Prime Data Center AUS-01","$400M",{"type":106,"geometry":250,"properties":254},{"type":56,"coordinates":251},[252,253],-101.325643,33.992308,{"city":255,"uuid":256,"county":257,"filings":231,"projects":258,"first_year":144,"total_cost":178,"latest_year":144,"cost_flagged":34,"largest_cost":178,"geometry_source":94,"largest_project":259,"new_construction":231,"total_cost_label":260},"Floydada","b153bbd6-ebc4-48bf-a806-2c9833ad2a16","Floyd","CONFIDENTIAL DATA CENTER ($300M)","CONFIDENTIAL DATA CENTER","$300M",{"type":106,"geometry":262,"properties":266},{"type":56,"coordinates":263},[264,265],-96.784557,32.60072,{"city":267,"uuid":268,"county":141,"filings":231,"projects":269,"first_year":144,"total_cost":270,"latest_year":144,"cost_flagged":34,"largest_cost":270,"geometry_source":94,"largest_project":271,"new_construction":231,"total_cost_label":272},"Lancaster","7f5c939c-998e-46ed-9fee-b14ef8cde8ed","QTS DFW2-DC7 ($290M)",290000000,"QTS DFW2-DC7","$290M",{"type":106,"geometry":274,"properties":278},{"type":56,"coordinates":275},[276,277],-97.343746,31.098477,{"city":279,"uuid":280,"county":281,"filings":194,"projects":282,"first_year":283,"total_cost":284,"latest_year":85,"cost_flagged":34,"largest_cost":285,"geometry_source":94,"largest_project":286,"new_construction":126,"total_cost_label":287},"Temple","385ef6f1-e1a4-4468-9649-25183819518f","Bell","Temple Data Center ($197M); 5MW Temple Data Center ($31M); TTX Data Center ($0M); Temple Data Center NCB ($0M)","2022",228800000,197000000,"Temple Data Center","$229M",{"type":106,"geometry":289,"properties":293},{"type":56,"coordinates":290},[291,292],-97.1016596,32.9397259,{"city":294,"uuid":295,"county":173,"filings":231,"projects":296,"first_year":283,"total_cost":297,"latest_year":283,"cost_flagged":34,"largest_cost":297,"geometry_source":94,"largest_project":298,"new_construction":231,"total_cost_label":299},"Southlake","fc48d442-99db-491a-9d59-0ce0a4700b4a","Southlake Data Hall Campus ($188M)",187675500,"Southlake Data Hall Campus","$188M",{"type":106,"geometry":301,"properties":305},{"type":56,"coordinates":302},[303,304],-96.671738,33.104193,{"city":306,"uuid":307,"county":308,"filings":22,"projects":309,"first_year":310,"total_cost":311,"latest_year":128,"cost_flagged":34,"largest_cost":312,"geometry_source":94,"largest_project":313,"new_construction":204,"total_cost_label":314},"Allen","83a13e33-1481-40b7-9cd4-7fa0c4544d2f","Collin","CISCO SYSTEMS DATA CENTER ($85M); CyrusOne Allen DH2 Fit Up ($50M); Compass Datacenters DFW I-II, LLC ($1M); Evoque Data Center Pavement Repair ($0M); CyrusOne Allen, DH1 Fitup ($0M); MICRON DATA CENTER ($0M)","2009",136750000,85000000,"CISCO SYSTEMS DATA CENTER","$137M",{"type":106,"geometry":316,"properties":320},{"type":56,"coordinates":317},[318,319],-96.723152,32.916242,{"city":321,"uuid":322,"county":141,"filings":323,"projects":324,"first_year":159,"total_cost":325,"latest_year":80,"cost_flagged":34,"largest_cost":326,"geometry_source":94,"largest_project":327,"new_construction":34,"total_cost_label":328},"Carrollton","5dc36d6b-10a2-47fc-804a-21f8cdb8402c",20,"CYRUSONE CARROLLTON DATA HALL 2\u002F3 ($40M); CYRUSONE CARROLLTON DATA CENTER ($23M); CYRUSONE CARROLLTON DATA CENTER PHASE II ($10M); CYRUSONE CARROLLTON DATA HALL 5 ($9M); CYRUSONE CARROLLTON PHASE III DH 6 ($9M); CYRUSONE CARROLLTON DATA CENTER DH-2 ($8M)",127290303,40000000,"CYRUSONE CARROLLTON DATA HALL 2\u002F3","$127M",{"type":106,"geometry":330,"properties":334},{"type":56,"coordinates":331},[332,333],-96.8051358,33.0966037,{"city":335,"uuid":336,"county":308,"filings":163,"projects":337,"first_year":159,"total_cost":338,"latest_year":144,"cost_flagged":34,"largest_cost":339,"geometry_source":94,"largest_project":340,"new_construction":204,"total_cost_label":341},"Plano","9ed943e3-1769-4d9f-923f-e5b49c56051e","T5@DALLAS WHOLESALE DATA CENTER ($24M); DATA CENTER, PHASE II ($22M); VIAWEST SHILOH DATA CENTER ($20M); TECHNOLOGY SERVICES DATA CENTER PHASE 1 ($5M); Data Hall 7 ($4M); Databank DFW 3 Data Hall #3 ($3M)",81800000,24000000,"T5@DALLAS WHOLESALE DATA CENTER","$82M",{"type":106,"geometry":343,"properties":347},{"type":56,"coordinates":344},[345,346],-97.463763,31.056417,{"city":348,"uuid":349,"county":281,"filings":231,"projects":350,"first_year":351,"total_cost":352,"latest_year":351,"cost_flagged":34,"largest_cost":352,"geometry_source":94,"largest_project":286,"new_construction":231,"total_cost_label":353},"Unknown","3694b380-9b6f-4924-a186-34640455a365","Temple Data Center ($70M)","2021",70000000,"$70M",{"type":106,"geometry":355,"properties":359},{"type":56,"coordinates":356},[357,358],-95.229162,29.664437,{"city":360,"uuid":361,"county":362,"filings":216,"projects":363,"first_year":159,"total_cost":364,"latest_year":144,"cost_flagged":34,"largest_cost":365,"geometry_source":94,"largest_project":366,"new_construction":126,"total_cost_label":367},"Houston","e91621ab-d371-45b6-b4dc-18bc3185e983","Harris","Netrality Data Centers Level 9 & Level 13.5  ($11M); N. FREEWAY DATA CENTER ($10M); DIGITAL REALTY TRUST DATA HALL EXPANSION ($9M); EXXONMOBIL HOUSTON DATA CENTER EXPANSION ($5M); EXXONMOBILE - DATA CENTER ELECTRICAL ($4M); HCHD-HOLLY HALL-LEVEL2-DATA CENTER ($3M)",64125300,11000000,"Netrality Data Centers Level 9 & Level 13.5 ","$64M",{"type":106,"geometry":369,"properties":373},{"type":56,"coordinates":370},[371,372],-97.935641,30.3049487,{"city":374,"uuid":375,"county":376,"filings":377,"projects":378,"first_year":310,"total_cost":379,"latest_year":85,"cost_flagged":34,"largest_cost":380,"geometry_source":94,"largest_project":381,"new_construction":34,"total_cost_label":382},"Austin","89d7ec13-c3e4-4fb0-8199-91dba8cf5ebe","Travis",17,"U. OF TEXAS DATA CENTER @ CRB ($23M); CyrusOne Austin Met III Data Hall 4 ($12M); DATA CENTER EXPANSION ($7M); AN4 DATA CENTER RENOVATION ($4M); ONRAMP DATA CENTER ($4M); VCHNGE DATA CENTER RENOVATION ($3M)",61479355,23000000,"U. OF TEXAS DATA CENTER @ CRB","$61M",{"type":106,"geometry":384,"properties":388},{"type":56,"coordinates":385},[386,387],-96.9254764,33.0359771,{"city":321,"uuid":389,"county":390,"filings":45,"projects":391,"first_year":392,"total_cost":393,"latest_year":394,"cost_flagged":34,"largest_cost":395,"geometry_source":94,"largest_project":396,"new_construction":34,"total_cost_label":397},"e804104d-d8ed-4f5b-8edf-01ee34bbae9a","Denton","CyrusOne Carrollton Data Center-Floater Yard 03 ($25M); CYRUSONE CARROLLTON DH 5 SERVICE YARD ($18M); CYRUSONE CARROLLTON DATA HALL 4 ($9M); Cyrusone Carrollton Data Center-DH1 AHU Build-Out ($1M); Cyrusone Carrollton Data Center-DH6 Load Adder ($1M)","2015",53765000,"2020",25000000,"CyrusOne Carrollton Data Center-Floater Yard 03","$54M",{"type":106,"geometry":399,"properties":403},{"type":56,"coordinates":400},[401,402],-96.6480963,32.9089771,{"city":404,"uuid":405,"county":141,"filings":204,"projects":406,"first_year":407,"total_cost":408,"latest_year":407,"cost_flagged":34,"largest_cost":395,"geometry_source":94,"largest_project":409,"new_construction":34,"total_cost_label":410},"Garland","25efff60-d9f5-42c8-b33c-2942ccf3e7d8","Data Center TX3 - Tenant Improvements ($25M); Data Center TX2 - Tenant Improvements ($25M)","2023",50000000,"Data Center TX3 - Tenant Improvements","$50M",{"type":106,"geometry":412,"properties":416},{"type":56,"coordinates":413},[414,415],-96.708291,32.978538,{"city":417,"uuid":418,"county":141,"filings":204,"projects":419,"first_year":420,"total_cost":421,"latest_year":80,"cost_flagged":34,"largest_cost":422,"geometry_source":94,"largest_project":423,"new_construction":204,"total_cost_label":424},"Richardson","66e6f0b5-44d6-4ecc-b79a-e61c31de92db","EDGECORE DATA CENTERS - COLD SHELL ($32M); WTX MODULAR DATA CENTER ($17M)","2011",49000000,32000000,"EDGECORE DATA CENTERS - COLD SHELL","$49M",{"type":106,"geometry":426,"properties":430},{"type":56,"coordinates":427},[428,429],-95.3695062,29.7608026,{"city":360,"uuid":431,"county":360,"filings":231,"projects":432,"first_year":351,"total_cost":433,"latest_year":351,"cost_flagged":34,"largest_cost":433,"geometry_source":94,"largest_project":434,"new_construction":34,"total_cost_label":435},"1a3a07b8-496d-4f8a-93b2-827d77cf2c37","CyrusOne Houston West 3 Data Hall Fitout-Project durden ($45M)",45000000,"CyrusOne Houston West 3 Data Hall Fitout-Project durden","$45M",{"type":106,"geometry":437,"properties":441},{"type":56,"coordinates":438},[439,440],-95.456619,30.20757,{"city":442,"uuid":443,"county":444,"filings":204,"projects":445,"first_year":446,"total_cost":447,"latest_year":351,"cost_flagged":34,"largest_cost":448,"geometry_source":94,"largest_project":449,"new_construction":231,"total_cost_label":450},"The Woodlands","0f6594d8-b0ae-4259-9d4a-ebe11ebdff1b","Montgomery","STREAM HOUSTON PRIVATE DATA CENTER I ($35M); Woodlands Data Center C118 ($9M)","2012",43967629,35000000,"STREAM HOUSTON PRIVATE DATA CENTER I","$44M",{"type":106,"geometry":452,"properties":455},{"type":56,"coordinates":453},[60,454],31.7601062,{"city":456,"uuid":457,"county":456,"filings":194,"projects":458,"first_year":459,"total_cost":460,"latest_year":85,"cost_flagged":34,"largest_cost":461,"geometry_source":94,"largest_project":462,"new_construction":231,"total_cost_label":463},"El Paso","a7f57a2e-fccc-483f-83c5-908d27f13148","Oppidan 5MW Data Center ($27M); Education Building - Data Center ($3M); EPCC DATA CONTROL CENTER RENOVATIONS ($1M); NEW DATA CENTER ($0M)","2014",31223000,27173000,"Oppidan 5MW Data Center","$31M",{"type":106,"geometry":465,"properties":469},{"type":56,"coordinates":466},[467,468],-97.643247,30.4774202,{"city":470,"uuid":471,"county":376,"filings":231,"projects":472,"first_year":283,"total_cost":473,"latest_year":283,"cost_flagged":34,"largest_cost":473,"geometry_source":94,"largest_project":474,"new_construction":34,"total_cost_label":475},"Pflugerville","5698a1c1-6566-4c3d-880a-3583ecc93a60","Skybox-Austin 1-Data Center Upfit ($28M)",28500000,"Skybox-Austin 1-Data Center Upfit","$28M",{"type":106,"geometry":477,"properties":481},{"type":56,"coordinates":478},[479,480],-97.8453305,30.5918648,{"city":482,"uuid":483,"county":484,"filings":231,"projects":485,"first_year":351,"total_cost":486,"latest_year":351,"cost_flagged":34,"largest_cost":486,"geometry_source":94,"largest_project":487,"new_construction":231,"total_cost_label":488},"Leander","bb846493-ae5e-404b-b508-4989ff746761","Williamson","PEC Control and Data Center ($22M)",22000000,"PEC Control and Data Center","$22M",{"type":106,"geometry":490,"properties":494},{"type":56,"coordinates":491},[492,493],-100.21108,34.428844,{"city":495,"uuid":496,"county":495,"filings":204,"projects":497,"first_year":128,"total_cost":498,"latest_year":85,"cost_flagged":34,"largest_cost":499,"geometry_source":94,"largest_project":500,"new_construction":204,"total_cost_label":501},"Childress","b35483aa-e338-41f4-9b1f-5829c8ab01bc","Childress Data Center Campus Upgrades ($15M); Iris - Childress Data Center ($4M)",18863400,15000000,"Childress Data Center Campus Upgrades","$19M",{"type":106,"geometry":503,"properties":507},{"type":56,"coordinates":504},[505,506],-97.10711,32.735594,{"city":508,"uuid":509,"county":173,"filings":45,"projects":510,"first_year":446,"total_cost":511,"latest_year":85,"cost_flagged":34,"largest_cost":499,"geometry_source":94,"largest_project":512,"new_construction":231,"total_cost_label":513},"Arlington","e532253b-674d-4ff4-a9d0-e0eb2dc7975f","Arlington Data Center ($15M); GM Financial Data Center Power Upgrades ($2M); WIRELINE NETWORK DATA CENTER BUILDOUT ($1M); 3rd Floor VA Data Center ($0M); NEDDERMAN HALL DATA CENTER RMS 114 & 115 ($0M)",18423000,"Arlington Data Center","$18M",{"type":106,"geometry":515,"properties":519},{"type":56,"coordinates":516},[517,518],-96.371827,30.610345,{"city":520,"uuid":521,"county":522,"filings":126,"projects":523,"first_year":407,"total_cost":524,"latest_year":85,"cost_flagged":34,"largest_cost":525,"geometry_source":94,"largest_project":526,"new_construction":231,"total_cost_label":513},"College Station","b856470a-378c-4b87-b9ba-88a25b79ef8a","Brazos","Rellis Campus Data and Research Center ($10M); Rellis Campus Data and Research Center - Tenant Improvement ($5M); TAMU West Campus Data Center - 2B ($2M)",17500000,10000000,"Rellis Campus Data and Research Center",{"type":106,"geometry":528,"properties":532},{"type":56,"coordinates":529},[530,531],-97.2888686,32.9918555,{"city":171,"uuid":533,"county":390,"filings":231,"projects":534,"first_year":128,"total_cost":535,"latest_year":128,"cost_flagged":34,"largest_cost":535,"geometry_source":94,"largest_project":536,"new_construction":34,"total_cost_label":537},"81917477-0a72-4d94-982f-6bfc21506499","QTS FTW1 DH1&5 Phase 2 ($16M)",16300000,"QTS FTW1 DH1&5 Phase 2","$16M",{"type":106,"geometry":539,"properties":543},{"type":56,"coordinates":540},[541,542],-97.8961553,29.8706181,{"city":544,"uuid":545,"county":546,"filings":204,"projects":547,"first_year":420,"total_cost":548,"latest_year":144,"cost_flagged":34,"largest_cost":549,"geometry_source":94,"largest_project":550,"new_construction":231,"total_cost_label":551},"San Marcos","e1a11d95-871f-493f-9b7a-663fcec2964f","Hays","PARKING GARAGE\u002FDATA CENTER ($12M); JC Kellam 7th Floor Data Center ($0M)",12620000,12300000,"PARKING GARAGE\u002FDATA CENTER","$13M",{"type":106,"geometry":553,"properties":557},{"type":56,"coordinates":554},[555,556],-95.500458,29.78947,{"city":558,"uuid":559,"county":362,"filings":194,"projects":560,"first_year":561,"total_cost":562,"latest_year":85,"cost_flagged":34,"largest_cost":563,"geometry_source":94,"largest_project":564,"new_construction":204,"total_cost_label":565},"Spring","f1c92adc-27b1-49b6-8bd7-d9a668bb6c5f","TRG Datacenters Phase 3 ($7M); TRG Datacenters Phase II Expansion ($4M); TRG DATACENTER ($2M); Spear Street Capital Data Center Decomissioning 10000 Energy Drive ($0M)","2016",12445330,6645330,"TRG Datacenters Phase 3","$12M",{"type":106,"geometry":567,"properties":571},{"type":56,"coordinates":568},[569,570],-96.6994224,32.9993264,{"city":417,"uuid":572,"county":308,"filings":231,"projects":573,"first_year":80,"total_cost":574,"latest_year":80,"cost_flagged":34,"largest_cost":574,"geometry_source":94,"largest_project":575,"new_construction":231,"total_cost_label":565},"488a595a-3e3d-43ee-95ef-3fb588be76fd","RICHARDSON DATA CENTER ($12M)",12000000,"RICHARDSON DATA CENTER",{"type":106,"geometry":577,"properties":581},{"type":56,"coordinates":578},[579,580],-97.042091,32.841482,{"city":582,"uuid":583,"county":141,"filings":204,"projects":584,"first_year":159,"total_cost":585,"latest_year":392,"cost_flagged":34,"largest_cost":586,"geometry_source":94,"largest_project":587,"new_construction":34,"total_cost_label":588},"Dfw Airport","753626f1-34c4-4177-a7bf-8d8b92c709c2","A NEW DATA CENTER FOR DFW AIRPORT ($9M); ALTERNATE DATA CENTER ($3M)",11200000,8600000,"A NEW DATA CENTER FOR DFW AIRPORT","$11M",{"type":106,"geometry":590,"properties":594},{"type":56,"coordinates":591},[592,593],-94.9245705,29.7602485,{"city":595,"uuid":596,"county":362,"filings":231,"projects":597,"first_year":561,"total_cost":598,"latest_year":561,"cost_flagged":34,"largest_cost":598,"geometry_source":94,"largest_project":599,"new_construction":231,"total_cost_label":588},"Baytown","6996e360-09f9-4a1f-899e-f6789a8d36f4","GCCISD | NEW DATA CENTER ($11M)",11125000,"GCCISD | NEW DATA CENTER",{"type":106,"geometry":601,"properties":604},{"type":56,"coordinates":602},[603,61],-98.235698,{"city":605,"uuid":606,"county":607,"filings":204,"projects":608,"first_year":283,"total_cost":609,"latest_year":85,"cost_flagged":34,"largest_cost":610,"geometry_source":94,"largest_project":611,"new_construction":34,"total_cost_label":612},"Mcallen","99a7b584-0f22-4270-96d8-3e6c51cb271e","Hidalgo","T-Mobile McAllen Data Center Ph2 ($10M); McAllen Data Center  ($0M)",9700000,9500000,"T-Mobile McAllen Data Center Ph2","$10M",{"type":106,"geometry":614,"properties":618},{"type":56,"coordinates":615},[616,617],-95.478972,30.425268,{"city":619,"uuid":620,"county":444,"filings":231,"projects":621,"first_year":128,"total_cost":622,"latest_year":128,"cost_flagged":34,"largest_cost":622,"geometry_source":94,"largest_project":623,"new_construction":231,"total_cost_label":624},"Willis","6f9c4e6f-d9ea-4030-ba06-7b8414f516e2","Willis Data Center ($8M)",7500000,"Willis Data Center","$8M",{"type":106,"geometry":626,"properties":630},{"type":56,"coordinates":627},[628,629],-103.154487,31.752816,{"city":631,"uuid":632,"county":633,"filings":231,"projects":634,"first_year":128,"total_cost":635,"latest_year":128,"cost_flagged":34,"largest_cost":635,"geometry_source":94,"largest_project":636,"new_construction":231,"total_cost_label":637},"Wink","a05f9ebf-67b3-4ec4-a1a6-cbb3de972a65","Winkler","Black Pearl Data Center ($7M)",7000000,"Black Pearl Data Center","$7M",{"type":106,"geometry":639,"properties":643},{"type":56,"coordinates":640},[641,642],-100.735152,33.787417,{"city":644,"uuid":645,"county":646,"filings":231,"projects":647,"first_year":351,"total_cost":635,"latest_year":351,"cost_flagged":34,"largest_cost":635,"geometry_source":94,"largest_project":648,"new_construction":231,"total_cost_label":637},"Afton","10b23644-6612-4739-9c52-8acb7b584590","Dickens","DPN Data Center ($7M)","DPN Data Center",{"type":106,"geometry":650,"properties":654},{"type":56,"coordinates":651},[652,653],-96.800743,32.516662,{"city":655,"uuid":656,"county":71,"filings":231,"projects":657,"first_year":394,"total_cost":658,"latest_year":394,"cost_flagged":34,"largest_cost":658,"geometry_source":94,"largest_project":659,"new_construction":231,"total_cost_label":660},"Red Oak","87721108-0c3d-480d-889b-1add7d4c4ddc","Compass Datacenters DFW III-I, LLC ($5M)",5000000,"Compass Datacenters DFW III-I, LLC","$5M",{"type":106,"geometry":662,"properties":666},{"type":56,"coordinates":663},[664,665],-95.551435,30.720391,{"city":667,"uuid":668,"county":669,"filings":231,"projects":670,"first_year":459,"total_cost":671,"latest_year":459,"cost_flagged":34,"largest_cost":671,"geometry_source":94,"largest_project":672,"new_construction":231,"total_cost_label":673},"Huntsville","a8e9d9b1-a317-400d-9b79-628ab550223a","Walker","GHC 9-1-1 DATA CENTER ($4M)",4500000,"GHC 9-1-1 DATA CENTER","$4M",{"type":106,"geometry":675,"properties":679},{"type":56,"coordinates":676},[677,678],-97.1952869,32.8478048,{"city":680,"uuid":681,"county":173,"filings":231,"projects":682,"first_year":144,"total_cost":683,"latest_year":144,"cost_flagged":34,"largest_cost":683,"geometry_source":94,"largest_project":684,"new_construction":231,"total_cost_label":673},"North Richland Hills","2dd5928c-e90f-4644-a317-9352460a21cd","Wuliger Way Data Center ($4M)",3600000,"Wuliger Way Data Center",{"type":106,"geometry":686,"properties":690},{"type":56,"coordinates":687},[688,689],-95.8075862,29.9040739,{"city":691,"uuid":692,"county":362,"filings":126,"projects":693,"first_year":392,"total_cost":694,"latest_year":407,"cost_flagged":34,"largest_cost":695,"geometry_source":94,"largest_project":696,"new_construction":34,"total_cost_label":673},"Katy","3503c459-353a-4b5b-a2ef-0f7d0d698e77","SKYBOX - DATA HALL 3 ($3M); Fugro Data Center ($0M); DNV GL DATA CENTER EXPANSION ($0M)",3507340,3011541,"SKYBOX - DATA HALL 3",{"type":106,"geometry":698,"properties":702},{"type":56,"coordinates":699},[700,701],-94.656017,31.603869,{"city":703,"uuid":704,"county":703,"filings":231,"projects":705,"first_year":80,"total_cost":706,"latest_year":80,"cost_flagged":34,"largest_cost":706,"geometry_source":94,"largest_project":707,"new_construction":231,"total_cost_label":708},"Nacogdoches","f53408f0-3082-443c-96d8-38127074f594","ELLIOTT ELECTRIC DATA CENTER ($3M)",2700000,"ELLIOTT ELECTRIC DATA CENTER","$3M",{"type":106,"geometry":710,"properties":714},{"type":56,"coordinates":711},[712,713],-102.4757643,31.8316672,{"city":715,"uuid":716,"county":717,"filings":231,"projects":718,"first_year":459,"total_cost":719,"latest_year":459,"cost_flagged":34,"largest_cost":719,"geometry_source":94,"largest_project":720,"new_construction":34,"total_cost_label":721},"Odessa","cacadb12-8d48-42fb-aa10-c01f09eca0dd","Ector","ECTOR COUNTY ISD DATA CENTER REMODEL ($2M)",2500000,"ECTOR COUNTY ISD DATA CENTER REMODEL","$2M",{"type":106,"geometry":723,"properties":727},{"type":56,"coordinates":724},[725,726],-98.2434096,29.8330957,{"city":728,"uuid":729,"county":730,"filings":204,"projects":731,"first_year":80,"total_cost":732,"latest_year":283,"cost_flagged":34,"largest_cost":733,"geometry_source":94,"largest_project":734,"new_construction":34,"total_cost_label":721},"New Braunfels","e0205a4b-8f24-4a7e-bf11-9b278884533b","Comal","COMAL ISD DATA CENTER RELOCATION ($1M); SSFCU 306 Data Center ($1M)",2400000,1400000,"COMAL ISD DATA CENTER RELOCATION",{"type":106,"geometry":736,"properties":740},{"type":56,"coordinates":737},[738,739],-96.993221,32.989285,{"city":741,"uuid":742,"county":390,"filings":45,"projects":743,"first_year":310,"total_cost":744,"latest_year":561,"cost_flagged":34,"largest_cost":745,"geometry_source":94,"largest_project":746,"new_construction":34,"total_cost_label":721},"Lewisville","92da56db-efc2-4206-9681-a2e701f2e19d","CYRUSONE LEWISVILLE - DATA HALL 5 ($1M); NATIONSTAR-DATA CENTER EXPANSION ($1M); CYRUSONE LEWISVILLE DATA HALL 4 ($0M); DATA HALL 9, BUILDING 7 ($0M); CYRUSONE LEWISVILLE DATA HALL 10 ($0M)",2380000,1200000,"CYRUSONE LEWISVILLE - DATA HALL 5",{"type":106,"geometry":748,"properties":752},{"type":56,"coordinates":749},[750,751],-97.13245,33.215533,{"city":390,"uuid":753,"county":390,"filings":194,"projects":754,"first_year":351,"total_cost":755,"latest_year":351,"cost_flagged":34,"largest_cost":756,"geometry_source":94,"largest_project":757,"new_construction":194,"total_cost_label":721},"ff42be9f-7837-4274-bc0e-c94175c55839","Core Scientific Denton Data Center North Parcel Tech Building ($1M); Core Scientific Denton Data Center South Parcel Tech Building ($1M); Core Scientific Denton Data Center North Parcel Guard Station ($0M); Core Scientific Denton Data Center South Parcel Guard Station ($0M)",2100000,1000000,"Core Scientific Denton Data Center North Parcel Tech Building",{"type":106,"geometry":759,"properties":763},{"type":56,"coordinates":760},[761,762],-100.437304,31.46378,{"city":764,"uuid":765,"county":766,"filings":231,"projects":767,"first_year":128,"total_cost":768,"latest_year":128,"cost_flagged":34,"largest_cost":768,"geometry_source":94,"largest_project":769,"new_construction":34,"total_cost_label":721},"San Angelo","01a3f157-a625-45ea-9805-1ac5267f098d","Tom Green","San Angelo ISD Data Center Relocation, Electrical Repairs, Building Demolition, and Asbestos Abatem ($2M)",2000000,"San Angelo ISD Data Center Relocation, Electrical Repairs, Building Demolition, and Asbestos Abatem",{"type":106,"geometry":771,"properties":775},{"type":56,"coordinates":772},[773,774],-95.300644,32.350763,{"city":776,"uuid":777,"county":778,"filings":231,"projects":779,"first_year":407,"total_cost":768,"latest_year":407,"cost_flagged":34,"largest_cost":768,"geometry_source":94,"largest_project":780,"new_construction":34,"total_cost_label":721},"Tyler","33aba437-79d9-4580-9816-a4a1aaa1f93b","Smith","06-23 Smith County IT Data Center Improvements ($2M)","06-23 Smith County IT Data Center Improvements",{"type":106,"geometry":782,"properties":786},{"type":56,"coordinates":783},[784,785],-97.8742729,29.9874079,{"city":787,"uuid":788,"county":546,"filings":231,"projects":789,"first_year":420,"total_cost":768,"latest_year":420,"cost_flagged":34,"largest_cost":768,"geometry_source":94,"largest_project":790,"new_construction":231,"total_cost_label":721},"Kyle","853fcaa2-da2d-4c32-85fb-0f61b8b7aef4","HAYS SECONDARY DATA CENTER ($2M)","HAYS SECONDARY DATA CENTER",{"type":106,"geometry":792,"properties":796},{"type":56,"coordinates":793},[794,795],-98.519739,29.522591,{"city":797,"uuid":798,"county":156,"filings":231,"projects":799,"first_year":351,"total_cost":800,"latest_year":351,"cost_flagged":34,"largest_cost":800,"geometry_source":94,"largest_project":801,"new_construction":34,"total_cost_label":721},"Castle Hills","cd32dcd3-0ccd-43ab-a5f7-83a31da9ad5d","#21244 - New Data Center ($2M)",1900000,"#21244 - New Data Center",{"type":106,"geometry":803,"properties":807},{"type":56,"coordinates":804},[805,806],-99.235793,30.079076,{"city":808,"uuid":809,"county":810,"filings":231,"projects":811,"first_year":392,"total_cost":812,"latest_year":392,"cost_flagged":34,"largest_cost":812,"geometry_source":94,"largest_project":813,"new_construction":231,"total_cost_label":721},"Ingram","dae5e1b1-7d0d-4dac-8c34-c3b43c3c2adf","Kerr","HILL COUNTRY TELEPHONE COOP-DATA CENTER ($2M)",1730070,"HILL COUNTRY TELEPHONE COOP-DATA CENTER",{"type":106,"geometry":815,"properties":819},{"type":56,"coordinates":816},[817,818],-96.8300414,32.9686055,{"city":820,"uuid":821,"county":141,"filings":194,"projects":822,"first_year":459,"total_cost":823,"latest_year":351,"cost_flagged":34,"largest_cost":824,"geometry_source":94,"largest_project":825,"new_construction":231,"total_cost_label":826},"Addison","0393b901-5a5a-4b6b-92e8-6007fd99e72e","BCS Data Center Operations Expansion ($1M); COMPASS DATACENTER ($0M); BCS Data Center Operations ($0M); DATA CENTER INC. ($0M)",1478567,645206,"BCS Data Center Operations Expansion","$1M",{"type":106,"geometry":828,"properties":832},{"type":56,"coordinates":829},[830,831],-102.078043,31.997433,{"city":833,"uuid":834,"county":833,"filings":231,"projects":835,"first_year":394,"total_cost":836,"latest_year":394,"cost_flagged":34,"largest_cost":836,"geometry_source":94,"largest_project":837,"new_construction":34,"total_cost_label":826},"Midland","b32aba1c-632b-4670-a559-8600b119eaf6","BBT Midland Data Center ($1M)",1100000,"BBT Midland Data Center",{"type":106,"geometry":839,"properties":843},{"type":56,"coordinates":840},[841,842],-97.588015,30.146055,{"city":844,"uuid":845,"county":376,"filings":231,"projects":846,"first_year":561,"total_cost":756,"latest_year":561,"cost_flagged":34,"largest_cost":756,"geometry_source":94,"largest_project":847,"new_construction":34,"total_cost_label":826},"Del Valle","dc27ea98-9245-4a0f-b496-3b81d7d8e43a","DEL VALLE ISD DATA CENTER EXPANSION ($1M)","DEL VALLE ISD DATA CENTER EXPANSION",{"type":106,"geometry":849,"properties":853},{"type":56,"coordinates":850},[851,852],-97.1300219,31.5568251,{"city":854,"uuid":855,"county":856,"filings":204,"projects":857,"first_year":310,"total_cost":858,"latest_year":176,"cost_flagged":34,"largest_cost":859,"geometry_source":94,"largest_project":860,"new_construction":34,"total_cost_label":826},"Waco","aa1b8ec2-03c3-4fd5-9613-df02e7f3c49b","McLennan","WACO DATA CENTER ($1M); WACO DATA CENTER ($0M)",900000,750000,"WACO DATA CENTER",{"type":106,"geometry":862,"properties":866},{"type":56,"coordinates":863},[864,865],-97.547087,30.5429642,{"city":867,"uuid":868,"county":484,"filings":231,"projects":869,"first_year":144,"total_cost":858,"latest_year":144,"cost_flagged":34,"largest_cost":858,"geometry_source":94,"largest_project":870,"new_construction":34,"total_cost_label":826},"Hutto","3694da18-f65b-454e-b660-c646e3f9c671","Hutto Data Center Building - 3 ($1M)","Hutto Data Center Building - 3",{"type":106,"geometry":872,"properties":876},{"type":56,"coordinates":873},[874,875],-97.2256047,33.0039746,{"city":877,"uuid":878,"county":390,"filings":231,"projects":879,"first_year":561,"total_cost":880,"latest_year":561,"cost_flagged":34,"largest_cost":880,"geometry_source":94,"largest_project":881,"new_construction":34,"total_cost_label":826},"Roanoke","dab9a7fb-2479-498c-9555-c6b31347eccb","CITI SOUTHWEST DATA CENTER KIOSK MODS ($1M)",800000,"CITI SOUTHWEST DATA CENTER KIOSK MODS",{"type":106,"geometry":883,"properties":887},{"type":56,"coordinates":884},[885,886],-95.600817,33.141614,{"city":888,"uuid":889,"county":890,"filings":231,"projects":891,"first_year":561,"total_cost":859,"latest_year":561,"cost_flagged":34,"largest_cost":859,"geometry_source":94,"largest_project":892,"new_construction":34,"total_cost_label":826},"Sulphur Springs","b2845ec9-24a3-4134-b318-53de34d91b0b","Hopkins","CITY NTIONAL BANK DATA CENTER ($1M)","CITY NTIONAL BANK DATA CENTER",{"type":106,"geometry":894,"properties":898},{"type":56,"coordinates":895},[896,897],-98.0874959,30.1907026,{"city":899,"uuid":900,"county":546,"filings":231,"projects":901,"first_year":392,"total_cost":859,"latest_year":392,"cost_flagged":34,"largest_cost":859,"geometry_source":94,"largest_project":902,"new_construction":34,"total_cost_label":826},"Dripping Springs","21a9993c-8f1a-42a9-8294-e35a10b2e267","DRIPPING SPRINGS ISD | HS DATA CENTER AD ($1M)","DRIPPING SPRINGS ISD | HS DATA CENTER AD",{"type":106,"geometry":904,"properties":908},{"type":56,"coordinates":905},[906,907],-95.5296653,29.5276943,{"city":909,"uuid":910,"county":911,"filings":231,"projects":912,"first_year":176,"total_cost":913,"latest_year":176,"cost_flagged":34,"largest_cost":913,"geometry_source":94,"largest_project":914,"new_construction":34,"total_cost_label":826},"Missouri City","282d5eda-9512-4e4c-8eb6-fe145ec325cd","Fort Bend","LANDMARK DATA CENTER ($1M)",620000,"LANDMARK DATA CENTER",{"type":106,"geometry":916,"properties":919},{"type":56,"coordinates":917},[918,63],-101.9374859,{"city":920,"uuid":921,"county":922,"filings":204,"projects":923,"first_year":459,"total_cost":924,"latest_year":392,"cost_flagged":34,"largest_cost":925,"geometry_source":94,"largest_project":926,"new_construction":34,"total_cost_label":826},"Amarillo","6974e88b-3c42-4ed1-88a1-e1c002663db4","Potter","BLUE BOX DATA CENTER ($0M); ANB DATA CENTER- 2014 RENOVATIONS ($0M)",550000,300000,"BLUE BOX DATA CENTER",{"type":106,"geometry":928,"properties":932},{"type":56,"coordinates":929},[930,931],-97.012202,32.988041,{"city":741,"uuid":933,"county":141,"filings":231,"projects":934,"first_year":310,"total_cost":924,"latest_year":310,"cost_flagged":34,"largest_cost":924,"geometry_source":94,"largest_project":935,"new_construction":34,"total_cost_label":826},"8aae705f-541f-4f6a-a617-81f66ed103f4","CYRUS ONE DATA HALL 4 ($1M)","CYRUS ONE DATA HALL 4",{"type":106,"geometry":937,"properties":940},{"type":56,"coordinates":938},[62,939],29.848445,{"city":941,"uuid":942,"county":943,"filings":231,"projects":944,"first_year":128,"total_cost":945,"latest_year":128,"cost_flagged":34,"largest_cost":945,"geometry_source":94,"largest_project":946,"new_construction":34,"total_cost_label":947},"Port Arthur","9f09836f-d0b8-495c-acb1-cb63c6b9ee48","Jefferson","New Data Center Project ($0M)",400000,"New Data Center Project","$0M",{"type":106,"geometry":949,"properties":953},{"type":56,"coordinates":950},[951,952],-95.6250251,30.0709347,{"city":954,"uuid":955,"county":362,"filings":231,"projects":956,"first_year":446,"total_cost":957,"latest_year":446,"cost_flagged":34,"largest_cost":957,"geometry_source":94,"largest_project":958,"new_construction":34,"total_cost_label":947},"Tomball","37c3ded6-122b-4f92-9ed5-78a08733d746","DATA CENTER RENOVATION ($0M)",375000,"DATA CENTER RENOVATION",{"type":106,"geometry":960,"properties":964},{"type":56,"coordinates":961},[962,963],-98.2729487,29.5508902,{"city":965,"uuid":966,"county":967,"filings":231,"projects":968,"first_year":459,"total_cost":969,"latest_year":459,"cost_flagged":34,"largest_cost":969,"geometry_source":94,"largest_project":970,"new_construction":34,"total_cost_label":947},"Schertz","baa907e3-4820-49f5-9a09-37df76bd2df7","Guadalupe","TESORO DATA CENTER REMODEL ($0M)",368000,"TESORO DATA CENTER REMODEL",{"type":106,"geometry":972,"properties":976},{"type":56,"coordinates":973},[974,975],-94.971739,29.368517,{"city":977,"uuid":978,"county":979,"filings":231,"projects":980,"first_year":128,"total_cost":981,"latest_year":128,"cost_flagged":34,"largest_cost":981,"geometry_source":94,"largest_project":982,"new_construction":231,"total_cost_label":947},"La Marque","a81f6f68-ccd2-4c5c-9126-a07e53843926","Galveston","Data Center Showroom Building ($0M)",358800,"Data Center Showroom Building",{"type":106,"geometry":984,"properties":988},{"type":56,"coordinates":985},[986,987],-96.60251,32.81344,{"city":989,"uuid":990,"county":141,"filings":231,"projects":991,"first_year":176,"total_cost":992,"latest_year":176,"cost_flagged":34,"largest_cost":992,"geometry_source":94,"largest_project":993,"new_construction":34,"total_cost_label":947},"Mesquite","b1673352-7904-4541-b249-774cedd1879a","HCL DATA CENTER RENOVATION ($0M)",350000,"HCL DATA CENTER RENOVATION",{"type":106,"geometry":995,"properties":999},{"type":56,"coordinates":996},[997,998],-97.1888487,32.6159439,{"city":1000,"uuid":1001,"county":173,"filings":231,"projects":1002,"first_year":176,"total_cost":1003,"latest_year":176,"cost_flagged":34,"largest_cost":1003,"geometry_source":94,"largest_project":1004,"new_construction":34,"total_cost_label":947},"Mansfield","ec088d37-8b2f-492b-b4c1-2c2e731d634f","MANSFIELD ISD DATA CENTER RENOVATIONS ($0M)",320000,"MANSFIELD ISD DATA CENTER RENOVATIONS",{"type":106,"geometry":1006,"properties":1010},{"type":56,"coordinates":1007},[1008,1009],-97.6434056,30.4781366,{"city":1011,"uuid":1012,"county":484,"filings":231,"projects":1013,"first_year":446,"total_cost":925,"latest_year":446,"cost_flagged":34,"largest_cost":925,"geometry_source":94,"largest_project":1014,"new_construction":34,"total_cost_label":947},"Round Rock","4ba893ec-f4f3-4e9b-976b-fd87cb215e49","DELLRR56 MOBILE DATA CENTER ($0M)","DELLRR56 MOBILE DATA CENTER",{"type":106,"geometry":1016,"properties":1020},{"type":56,"coordinates":1017},[1018,1019],-99.862731,32.433018,{"city":1021,"uuid":1022,"county":1023,"filings":231,"projects":1024,"first_year":420,"total_cost":1025,"latest_year":420,"cost_flagged":34,"largest_cost":1025,"geometry_source":94,"largest_project":1026,"new_construction":34,"total_cost_label":947},"Abilene","c8109fc3-4af3-4e11-80aa-6531c7ccbd7c","Taylor","ARMC DATA CENTER EXPANSION ($0M)",250000,"ARMC DATA CENTER EXPANSION",{"type":106,"geometry":1028,"properties":1032},{"type":56,"coordinates":1029},[1030,1031],-96.94497,32.700877,{"city":1033,"uuid":1034,"county":141,"filings":231,"projects":1035,"first_year":1036,"total_cost":1037,"latest_year":1036,"cost_flagged":34,"largest_cost":1037,"geometry_source":94,"largest_project":1038,"new_construction":34,"total_cost_label":947},"Grand Prairie","38709478-0500-410f-b387-5a1483b221d2","INMAR Data Center Addition ($0M)","2019",243000,"INMAR Data Center Addition",{"type":106,"geometry":1040,"properties":1044},{"type":56,"coordinates":1041},[1042,1043],-95.1933326,29.693379,{"city":1045,"uuid":1046,"county":362,"filings":231,"projects":1047,"first_year":392,"total_cost":1048,"latest_year":392,"cost_flagged":34,"largest_cost":1048,"geometry_source":94,"largest_project":1049,"new_construction":34,"total_cost_label":947},"Pasadena","e6955189-08e8-458e-abcf-c30633ad0f53","BAB BUILDING DATA CENTER MODIFICATIONS ($0M)",50000,"BAB BUILDING DATA CENTER MODIFICATIONS",{"type":106,"geometry":1051,"properties":1055},{"type":56,"coordinates":1052},[1053,1054],-96.274395,32.912418,{"city":1056,"uuid":1057,"county":1058,"filings":231,"projects":1059,"first_year":144,"total_cost":34,"latest_year":144,"cost_flagged":231,"largest_cost":1060,"geometry_source":94,"largest_project":1061,"new_construction":231,"total_cost_label":947},"Royse City","ce0af78f-7d48-4070-80d4-b461431b9c3d","Hunt","BT Gateway Data Center ($384M)",384000000,"BT Gateway Data Center",false]