Texas Data Center Construction Filings
source:    see https://geopen.io/d/texas-data-center-construction-filings
licence:   CC0-1.0
page:      https://geopen.io/d/texas-data-center-construction-filings
retrieved: 2026-11-21
features in source:    77
records in shapefile:  77

Field names were shortened to fit the 8-character limit imposed by the
DBF writer. See FIELDS.csv for the full mapping.
Coordinates are WGS84 (EPSG:4326).